Ministry of Transportation and Infrastructure – Little Sand Creek Bridge Replacement

The project included; the removal of an existing highway bridge and pedestrian bridge; provision of a temporary highway bridge and bypass; new bridge construction and cast-in-place concrete;  pre-stressed concrete stringers, grading, roadway and drainage excavation; clearing and grubbing; paving, roadside barrier, pavement marking, site restoration and landscaping, and in-stream placement of riprap and sediment control.

Project Details
Project:
Little Sand Creek Bridge Replacement
Value:
$2,795,086
Completion:
August 2014
Contact:
Tim Dyer, Ministry Representative
Phone:
(250) 354-6187