Malahat Nation Foreshore Reclamation

This project included the excavation and installation of 120 lineal meters of geotextile, filter rock, and riprap to provide foreshore protection. The toe of the riprap was located within the intertidal area and the entire project was in an area of high archaeological significance.

 

 

Project Details
Project:
Malahat Nation Foreshore Erosion Protection
Value:
500,000
Completion:
Septepmber 2023