Copcan has completed a variety of jobs ranging in cost from $150,000 to $8,500,000.

Construction Management
Cowichan Valley Regional District – Arbutus Ridge Waste Water Treatment Plant Upgrades
In the summer of 2018, Copcan was the successful proponent for the construction of...
Environmental Contracting
City of Nanaimo – Colliery Dam Spillway Construction
The project included; construction of auxiliary spillway for the lower Chase River Dam, which...
Environmental Contracting
City of Kimberley – Mark Creek Flume Management & Stream Rehabilitation
The project included; removal and disposal of 300 lineal metres of existing reinforced concrete...
Environmental Contracting
Small Craft Harbours, Fisheries and Oceans Canada
The project was to construct approx. 300m of new breakwater and 250m of breakwater...
Environmental Contracting
Island Timberlands – Duke Point Log Sort Expansion
The project included; stripping, blasting, loading, hauling and compacting rip rap and filter rock...
Demolition
Ruskin Construction Ltd – Duke Point Marine
The project included; demolition of existing barge berth structures including concrete abutments and buried...
Environmental Contracting
Nanaimo Port Authority – Duke Point Interim Barge Terminal Construction
The project included; installation of a 447 lock block wall within tidal waters; working...
Aggregate
Nanaimo Port Authority-Duke Point Interim Barge Terminal Construction
The project included; installation of a 447 lock block wall within tidal waters; working...